You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The 35 mail capacity wagon is built in maglev depots.
Either it is a bug in the NewGRF (possibly one of the vaccum sets, since a identical looking wagon with capacity 37 becomes available for vacuum later).
Or it is an incompatibility between the two track set: Vacuum, Progressive rail.
Maybe ask the NewGRF authors on the forums about these mail wagons with various capacities.
Milsa opened the ticket and wrote:
Attachments
Reported version: Version?
Operating system: All
This issue was imported from FlySpray: https://bugs.openttd.org/task/6079
The text was updated successfully, but these errors were encountered: