The cost of removing the secondary road type from a bridge/tunnel is only half of removing the equivalent length of secondary road type from plain road.
This is because in calculating the cost the length in tiles is used, instead of the length in pieces.
A patch to fix this is attached.
JGR opened the ticket and wrote:
Attachments
Reported version: trunk
Operating system: All
This issue was imported from FlySpray: https://bugs.openttd.org/task/6538