Cost of adding new road type to a bridge or a tunnel is undercalculated. #4681

Closed
DorpsGek opened this issue Jul 11, 2011 · 1 comment
Closed
Labels
flyspray This issue is imported from FlySpray (https://bugs.openttd.org/)

Comments

@DorpsGek
Copy link
Member

adf88 opened the ticket and wrote:

When adding new road type to an existing bridge or tunnel, the costs is halved.

Steps to reproduce:

  1. Build a road bridge
  2. Add tram tracks to the bridge, note the cost
  3. Build (somewhere else) a tram track as long as the bridge, note the cost
    The second cost as twice big as the first one.

Fix patch attached:

Attachments

Reported version: Version?
Operating system: All


This issue was imported from FlySpray: https://bugs.openttd.org/task/4681
@DorpsGek
Copy link
Member Author

Rubidium closed the ticket.

Reason for closing: Fixed

In r22699. Thanks for the fix.


This comment was imported from FlySpray: https://bugs.openttd.org/task/4681

@DorpsGek DorpsGek added Core flyspray This issue is imported from FlySpray (https://bugs.openttd.org/) labels Apr 7, 2018
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
flyspray This issue is imported from FlySpray (https://bugs.openttd.org/)
Projects
None yet
Development

No branches or pull requests

1 participant