FS#4681 - Cost of adding new road type to a bridge or a tunnel is undercalculated.

Attached to Project: OpenTTD
Opened by Grzegorz DuczyƄski (adf88) - Monday, 11 July 2011, 10:05 GMT
Last edited by Remko Bijker (Rubidium) - Saturday, 30 July 2011, 13:55 GMT
Type Bug
Category Core
Status Closed
Assigned To No-one
Operating System All
Severity Low
Priority Normal
Reported Version Version?
Due in Version Undecided
Due Date Undecided
Percent Complete 100%
Votes 0
Private No

Details

When adding new road type to an existing bridge or tunnel, the costs is halved.

Steps to reproduce:
1. Build a road bridge
2. Add tram tracks to the bridge, note the cost
3. Build (somewhere else) a tram track as long as the bridge, note the cost
The second cost as twice big as the first one.

Fix patch attached:
This task depends upon

Closed by  Remko Bijker (Rubidium)
Saturday, 30 July 2011, 13:55 GMT
Reason for closing:  Fixed
Additional comments about closing:  In r22699. Thanks for the fix.